Our Company Logo

Banjul


Frequently Asked Questions

Ask Adama

Dear Prospective Clients,

Building or renovating a home requires good communication  and a high level of trust between the client and the builder.

A successful project involves thousands of questions; the answers help to shape a great design and a finished product that satisfies your needs. 

Great building projects and lasting friendships often begin with a single question. So lets get started!  

E-mail your question to  adama.samba@gmail.com   or click on  "contact us"  at the left to reach any of the Adama Samba.

Frequently Asked Questions      

Q:  How long does it take to build a new home ?
A:  It varies and mostly depends on the size of the home and the level of finish.  A typical home with a finished lower level will take approximately six months to complete.  Of course, there are always factors that can change that, including weather, material selections, and Owner involvement.

Q:  How much per square meter does it cost to build a new home ?
A:  That is a difficult question.  Many things affect the square meter price of a home including landscaping, appliances, style of home and the types of finishes that are specified.  For example, we could build two homes side by side that are the exact same size and they could have very different prices.  One may be finished with aluzinc corrugate, Metal windows, laminate countertops, vinyl bathroom floors, and an unfinished garage.  The other one may have decra Bond roofing, stone veneer, quartz countertops, ceramic tile bathroom floors and a tiled garage.  It's easy to see why this is a difficult question to answer without going into a bit more detail.

Q:  What if we want to do our own painting and select our own materials?
A:  We are happy to work with our clients if they would like to be involved in certain aspects of finishing their homes. 

Q:  Do we need to hire an architect before we come to you?
A:  It's not necessary, but some of our clients do choose to work with an architect.  We have our in house designers.  We work together to create designs that are cost effective, functional, unique and very personal to fit your needs.  We work hard on floor plans to make sure that our homes are livable and comfortable.

Q:  How long does the planning of a new home take?
A:  Every home and every client is different.  The time line for planning varies with each job as some clients will come with plans, some come with pages torn out of magazines, some come with nothing.  Sometimes we are able to work through a design quickly, other times there is a lot of modifications that have to be made and that adds time to the time line.  For most clients, planning will take one to two months.

 

My status
Skype Me™!

Include me on MSN adama.samba@hotmail.com

free hit counters by free-counters.net

Home Page | Contact Us | About Us | Houses | Commercial | Services
Location Map | Links
 
Copyright © 2005 Value Engineering. All Rights Reserved.

Top of page